PP Unterstufe Lutz

Vorarlberg, Austria

In the winter of 2012, we were commissioned to carry out individual sleeve tests on the GRP pipeline DN with 2550 millimeters diameter.

After a successful refurbishment, we carried out a pressure test of the entire pipeline.

Sleeve tests

Pressure test